22 EN - Quick installation and start-up guide
Note: Frame R8 only:
If you connected the connector to only one conductor, ABB recommends to
put the conductor under the upper pressure plate.
The connectors are detachable, but ABB recommends not to detach them. If
you do, detach and reinstall the connectors as follows.
Input power cable
10. Connect the input power cable as in step 9.
EN
HI
M5×25/35
Frame size
R5
R6
R7
R8
Terminals T1/U, T2/V and T3/W
Remove the nut attached to the connector and its busbar.
Put the conductor under the connector pressure plate and pre-tighten the
conductor.
Put the connector back to its busbar. Start the nut, and turn it by hand to at
least two rotations.
Before using tools, make sure that the nut/screw is not cross-threaded.
Cross-threading damages the drive and causes danger.
9b
9a
8
L1, L2, L3, T1/U, T2/V, T3/W
N·m
lbf·ft
5.6
4.1
30
22.1
40
29.5
40
29.5
10b
10a
8
PE
N·m
lbf·ft
2.2
1.6
9.8
7.2
9.8
7.2
9.8
7.2
N·m
lbf·ft
1.2
0.9
1.2
0.9
1.2
0.9
1.2
0.9