The specific requirements for selecting a site for equipment room are as follows:
Equipment Room Layout
The equipment room is usually used to install mobile switching equipment, telecom
transmission equipment and power supply equipment as well as other auxiliary equipment. To
ensure easy maintenance and management, place the telecom equipment in different rooms.
Figure 5-79
Issue 02 (2015-05-18)
The room should be located at a distance of at least 5 km (3.11 mi.) from heavy pollution
sources such as smelting and coal mines. It should be located at a distance of at least 3.7
km (2.30 mi.) from moderate pollution sources such as chemical, rubber, and
galvanization factories. It should be located at a distance of at least 2 km (1.24 mi.) from
light pollution sources such as packinghouses and tanyards. If these pollution sources
cannot be avoided, ensure that the equipment room is upwind of the pollution sources. In
addition, adopt a high-quality equipment room or protection products.
The room should be located away from livestock farms, or in the upwind of the livestock
farms. Do not use an old livestock room or fertilizer warehouse as the equipment room.
The equipment room must be far away from the residential areas. The equipment room
that is not far away from the residential areas must comply with equipment room
construction standards to avoid noise pollution.
The doors and windows of the equipment room must be closed to keep an airtight room.
Using steel doors to ensure sound insulation is recommended.
No cracks or openings are allowed on the walls or floors. The outlet holes on the walls or
windows must be sealed. Walls must be constructed in the smooth, wear-resistant,
dustproof principles and produce the effect of flame retardant, sound insulation, heat
absorption, dust decrease, and electromagnetic shielding.
The air vent of the room should be far from the exhaust of city waste pipes, big cesspools
and sewage treatment tanks. The room should be in the positive pressure state to prevent
corrosive gases from entering the equipment room and corroding components and circuit
boards.
The room should be located far away from industrial and heating boilers.
It is recommended that the room be on or above the second floor. If this requirement
cannot be met, the ground for equipment installation in the room should be at least 600
mm (23.62 in,) above the maximum flood level.
The room should be at least 3.7 km (2.30 mi.) away from the seaside or salt lake.
Otherwise, the equipment room should be airtight with cooling facilities. In addition,
alkalized soil cannot be used as the construction material. Otherwise, equipment suitable
for wet conditions must be used.
The equipment room should be strong enough to resist winds and downpours.
The room should be located away from dusty roads or sand. If this is unavoidable, the
doors and windows of the equipment room must not face pollution sources.
Do not place air conditioning vents near the equipment so that they blow directly on the
equipment because condensation may be blown into the equipment.
Do not use decorative materials that contain sulfur in the equipment room.
shows the layout of the equipment room.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Appendix
67

Advertisement

Table of Contents
loading

Table of Contents