Pre-Maintenance Procedures; Preparing For Maintenance; Opening The Hood; Closing The Hood - Toro Reelmaster 5610 Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 5610:
Table of Contents

Advertisement

Pre-Maintenance
Procedures

Preparing for Maintenance

1.
Park the machine on a level surface, press the
enable/disable switch to the D
position, lower the cutting units, and engage the
parking brake.
2.
Shut off the engine, remove the key, and wait for
all moving parts to stop.
3.
Wait for the engine to cool.

Opening the Hood

1.
Release the 2 hood latches
Figure 58
1. Hood latch (2)
2.
Rotate open the hood.

Closing the Hood

1.
Carefully rotate the hood closed
and
ISENGAGE
(Figure
58).
g369009
(Figure
59).
40
Figure 59
1. Hood latch (2)
2.
Secure the hood with the 2 hood latches.

Opening the Screen

1.
Remove the ball pin from the screen latch
(Figure
60).
Figure 60
1. Ball pin
2.
Unlatch and open the screen.

Closing the Screen

1.
Close and latch the screen
g369219
g378175
2. Screen latch
(Figure
61).

Advertisement

Table of Contents
loading

This manual is also suitable for:

0367803678te

Table of Contents