Huawei RRU User Manual page 86

Hide thumbs Also See for RRU:
Table of Contents

Advertisement

3 Installing RRU and SRXU Hardware
Context
When transporting, moving or installing the equipment, components, or parts, you must:
l
l
Procedure
Step 1 Check the models and the quantity of components inside the packing case according to the
packing list.
If...
The quantity matches with the packing list, Go to
The quantity does not match with the
packing list,
Step 2 Check whether the packing case is in good condition.
If...
The packing case is in good condition,
The packing case is damaged or soaked, Find out the cause and contact the local Huawei
Step 3 Open the packing case. Check the shipped components according to the Packing List, and then
perform the next step according to the checking result.
If...
The shipped components match with the packing
list,
There is any short shipment, wrong shipment, or
damage to the goods,
3-28
CAUTION
Avoid collision with doors, walls, shelves, and other objects.
Avoid touching the uncoated metal surface of the equipment, components, or parts with sweat
soaked or dirty gloves.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
Then...
Step
2.
Find out the cause and contact the local
Huawei office.
Then...
Go to
Step
3.
office.
Then...
Sign the packing list with the customer.
Fill in the Cargo Problems Report.
RRU
User Guide
Issue 01 (2008-04-18)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru3804Rru3801e

Table of Contents