Huawei FusionModule 1000B Maintenance Manual page 31

Air-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Air-Cooled IT Solution
Maintenance Guide
Item
UPS5000-E
UPS5000-E
batteries
Issue 02 (2017-01-10)
Method
Expected
Result
displays
information
properly.
Check the running
data of the
UPS5000-E.
The input
voltage meets
the solution
requirement.
View the
The status
monitoring panel
icons on the
of the UPS5000-E.
LCD indicate
that all units
are operating
properly, all
operating
parameters are
within their
normal ranges,
and no fault or
alarm
information is
displayed.
View batteries.
Check the battery
temperature.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Troubleshooting
connected.
2. If the power cable is correctly
connected, replace the LCD by
following instructions in
Replacing a
Ambient
If the humidity and temperature are
temperature
abnormal, check the air conditioner
: 0-40° C
working status.
Humidity:
0-95% RH
(non-conde
nsing)
If the input voltage is abnormal,
verify that the output voltage of the
upstream PDC and the cable
connections are correct.
If an alarm is present, refer to the
UPS5000-E alarm reference to
check the device status and
parameters.
1. Clean the fan.
The battery
shell is
2. Take photos of the misshapen
intact,
parts and faulty parts of
without
batteries.
acid leaks,
3. Check and record the charge
deformatio
voltage and charge current of the
n, or
battery string, and the voltage of
bulges.
every single battery in this
battery string.
The battery
is free from
4. Check the battery surface
dust or dirt.
temperature.
5. Power off the battery string and
remove faulty batteries. After 30
minutes, check and record the
open-circuit voltages of the
faulty batteries.
The battery
Identify the cause of an abnormal
operating
battery operating temperature.
4 Routine Maintenance
6.1.1
PD510.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule 1000

Table of Contents