Huawei FusionModule2000 Product Description page 69

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Product Description (380 V)
Physical Ports
Table 3-33 Physical ports
Item
Refrigerant liquid pipe
Refrigerant gas pipe
Water inlet pipe to the
humidifier
Installation Requirements
When the total load power of servers corresponding to a single air conditioner is less than 5
kW or the equipment room airtightness is not satisfactory, the indoor humidity might be
relatively high, which is not a product quality issue. You are advised to install a dehumidifier
in the equipment room in this case.
Table 3-34 Installation requirements
Item
Equipment room door
Floor
Installation mode
Pipe and cable routing
Equivalent length of
one-way pipe
Height difference
between the indoor and
outdoor units
Thickness of the thermal
insulation foam
Issue 04 (2017-06-30)
Specifications
Copper pipe, with an outer diameter of 5/8 inch (15.88 mm)
and thickness of 1.0 mm, withstanding a pressure not smaller
than 4.5 MPa, welding
Copper pipe, with an outer diameter of 3/4 inch (19.05 mm)
and thickness of 1.0 mm, withstanding a pressure not smaller
than 4.5 MPa, welding
Reserved: BSPP 1/2 inch screw thread connector
Specifications
Width ≥ 0.9 m; height ≥ 2.3 m
Bearing capacity ≥ 350 kg/m
mm
Installed on a concrete floor, a base, or an ESD floor
Cables and pipes can be routed from the top or bottom
≤ 80 m
If the outdoor unit is placed higher than the indoor unit, the
maximum vertical distance between them is 20 m.
If the indoor unit is placed higher than the outdoor unit, the
maximum vertical distance between them is 5 m.
≥ 13 mm
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 System Architecture
2
; height of the raised floor ≥ 250
62

Advertisement

Table of Contents
loading

Table of Contents