Huawei NetCol5000-C030H90D0 User Manual page 120

In-row chilled water smart cooling product
Table of Contents

Advertisement

NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual (2019)
Tapping No or Exit, submission timeout, and system exception all result in
commissioning failures. Choose Maint > Wizard Startup to enter the Wizard
Startup screen for new commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 4-24 Startup wizard
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
Figure 4-25 Checking before startup
Step 3 Tap Yes for check items one by one according to the prompt messages on the
screen.
Step 4 Tap Yes and enter the screen where you select commissioning items, as shown in
Figure
Issue 03 (2020-08-30)
NO TICE
NO TE
● For the initial startup wizard, Last record is in grey, indicating that the operation is not
allowed.
● For the non-initial startup wizard, choose Last record and you can view the last startup
wizard report.
4-26.
Copyright © Huawei Technologies Co., Ltd.
4 Commissioning
Figure
4-24.
Figure
4-25.
112

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents