HUAWEI TP3106&TP3118S&TP3118 Telepresence
Installation Guide
Figure 6-2 Installing the connecting plates
1.
2.
Step 3 Attach the left and right curved connecting rods. The methods for installing the left and right
curved connecting rods are the same. The following procedure uses the right connecting rod as
an example. See
Issue 07 (2013-11-08)
Connect the left and center racks.
Keep the grooved surface of the left connecting plate upward, place it between the left and
center racks, and screw it to the racks by tightening the six M6 x 16 countersunk screws
using a rechargeable battery-powered electric screwdriver.
Connect the right and center racks.
Keep the grooved surface of the right connecting plate upward, place it between the right
and center racks, and screw it to the racks by tightening the six M6 x 16 countersunk screws
using a rechargeable battery-powered electric screwdriver.
Figure
6-3.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Racks
26