Honeywell Pallet Accuglide ZoneFlex Accumulation Conveyor Maintenance Manual page 26

Table of Contents

Advertisement

Preventive Maintenance
Checked
Changes/Repair
Initial Start-Up and Run-In Period
Date:
by:
made:
Initial Start-up/Run-In Period
Perform the following checks during the initial
start-up and run-in period. Perform the checks on
a daily basis for the first week then weekly for the
next three (3) weeks
General - Perform a walk through inspection and observe the following
Listen for unusual noises or excessive vibrations.
Observe the general condition of all floor supports
or hangers and other mounting hardware.
Chain Take Up - Observe the general condition of the chain tension
Check that the chain is tensioned.
Observe chain-to-sprocket alignment to ensure
the chain is properly aligned with the sprocket
teeth.
Air System
Check that the filter/regulator pressure is set at 25
psi.
Listen for leaks around pneumatic connections.
Chain - Observe the general condition of the chain
Check the chain for unusual signs of wear or
damage.
Check for mis-alignment at all sprockets in the
drive and idler sections.
Driver Pad - Observe the general condition of the driver pad
Check the pad to ensure it is properly seated on
the chain pins.
Observe the pad at the drive/idler sprockets to
ensure the carrier rollers are not contacting the
driver pad on the return side.
Check the condition of all driver pad splices.
Verify the pad is free of dirt or oil that may reduce
friction drive force.
Chain Track Lubricators - Observe oil consumption during the first four (4) weeks of
operation. This will set a bench-mark for future oil consumption needs.
Check the oil level in the oiler reservoir.
Check the chain for insufficient or over lubrication.
Check that the oiler air regulator is set at 12 psi.
Pallet Accuglide ZoneFlex Accumulation Conveyor
Maintenance Manual
20
|
| 29334206
February 14, 2018

Advertisement

Table of Contents
loading

Table of Contents