Operation
Continued from the previous page.
4. Apply a commercial leak test solution or a mixture of dishwashing liquid and
water to the hose connection.
5. Slowly rotate the knob on the discharge valve counterclockwise until the valve is
fully open.
6. Watch and listen carefully for indications of leaking LP. If a leak exists, bubbles
will form at the hose connection. Stop the leak before proceeding:
a. Close the discharge valve.
b. Disconnect and re-connect the hose, making sure the connection is tight.
c. Spray the hose connection with more leak test solution.
d. Slowly open the discharge valve and check again for leaks.
7. If there are no leaks, start the engine and run it for a few minutes to make sure
that LP is flowing smoothly.
Note: Do not use the choke when starting or operating the machine with LPG.
The LP cylinder has now been installed and the machine is ready for use.
40
CRT 48-33K
wc_tx002045gb.fm