Unpack and Install the Chassis
Note
The images in this chapter are only for representation purposes, unless specified otherwise. The chassis' actual
appearance and size may vary.
•
•
•
•
•
Unpack the Chassis
Tip
Be sure to save the packaging in case you need to return any of the components products.
Ensure that there is sufficient room around the chassis pallet for unpacking. For information about the chassis
dimensions and clearance requirements see, Clearance Requirements.
Carefully move the pallet containing the chassis to the staging area where you plan on unpacking it.
Unpack the Chassis, on page 19
Install Bottom-Support Rails, on page 23
Transfer Chassis to a Mechanical Lifting Device, on page 24
Mount Chassis Into the Rack, on page 25
Install Cable Management and Door Kit on a Chassis , on page 35
C H A P T E R
Hardware Installation Guide for Cisco 8800 Series Routers
3
19