Ntp- D124 Provision A Point-To-Point Network - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

NTP- D339 Point-to-Point Network Acceptance Test
Complete the
Step 5
the working STM-N port on both point-to-point nodes. Alternatively, if additional bandwidth is needed
for CTC management, complete the
on page
Note
Note
Complete the
Step 6
in the Unlocked-enabled service state.
Step 7
As needed, complete the
As needed, complete the
Step 8
As needed, complete the
Step 9
Verify that timing is set up at both point-to-point nodes. If not, complete the
Step 10
procedure on page 4-9
the timing source. The system will automatically choose the corresponding protect STM-N card as the
protect timing source. This will be visible in the Maintenance > Timing tab.
Step 11
Complete the
Stop. You have completed this procedure.
NTP-D339 Point-to-Point Network Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
(default) view appears. If you are already logged in, continue with Step 2.
From the View menu, choose Go to Network View.
Step 2
Click the Alarms tab.
Step 3
a.
Cisco ONS 15454 SDH Procedure Guide, R7.0
5-4
"DLP-D363 Provision Regenerator-Section DCC Terminations" task on page 20-68
20-71.
Data communications channel (DCC) terminations are not provisioned on the protect ports.
If the point-to-point nodes are not connected to a LAN, you will need to create the DCC
terminations using a direct (craft) connection to the node. Remote provisioning is possible only
after all nodes in the network have DCC terminations provisioned to Unlocked-enabled STM-N
ports.
"DLP-D214 Change the Service State for a Port" task on page 19-10
"DLP-D81 Provision a Proxy Tunnel" task on page
"DLP-D90 Provision a Firewall Tunnel" task on page
"DLP-D40 Create a Provisionable Patchcord" task on page
for one or both of the nodes. If a node uses line timing, make its working STM-N
"NTP-D339 Point-to-Point Network Acceptance Test" procedure on page
This procedure tests a point-to-point network.
Test set/cables appropriate to the test circuit you will create.
NTP-D124 Provision a Point-to-Point Network, page 5-3
As needed
Onsite
Provisioning or higher
"DLP-D60 Log into CTC" task on page 17-49
Verify that the alarm filter is not on. See the
page 19-25
as necessary.
"DLP-D364 Provision Multiplex-Section DCC Terminations" task
at one of the point-to-point nodes. The node
"DLP-D227 Disable Alarm Filtering" task on
Chapter 5
Turn Up a Network
for
to put the protect card
17-73.
17-83.
17-31.
"NTP-D28 Set Up Timing"
5-4.
78-17194-01

Advertisement

Table of Contents
loading

Table of Contents