Startup Procedure; Powering Up - GE Moisture monitor series 3 Programming Manual

Panametrics hygrometer
Hide thumbs Also See for Moisture monitor series 3:
Table of Contents

Advertisement

Startup Procedure

Powering Up

Basic Programming
Sensor configuration and system calibration data for your MMS-3 are
entered at the factory. After you unpack the unit, use the sections that
follow to verify that your system is working properly and set up the
screen to display the desired measurements.
The MMS-3 has a universal power supply that automatically adjusts
to line voltages from 95 to 260 VAC, and a portable battery pack
(optional). After making electrical connections as described in
Chapter 1 of the Startup Guide, press the
MMS-3.
IMPORTANT:
For compliance with the EU's Low Voltage Directive
(IEC 1010), this unit requires an external power
disconnect device such as a switch or circuit breaker.
The disconnect device must be marked as such,
clearly visible, directly accessible, and located
within 1.8 m (6 ft) of the MMS-3. The power line is
the main disconnect device.
Do not operate the Delta F Oxygen Cell for extended
periods of time at oxygen concentrations that are over
range. Trace and low percent range sensors may be
damaged if exposed to high levels of oxygen, such as air,
for long periods (>1 hour) while the MMS-3 is on.
If exposure is unavoidable, either disconnect the oxygen
cell from the MMS-3 or equip the sample system with a
valve that allows the cell to be switched to purge gas.
The MMS-3 normally shows a series of messages that indicate it is
functioning normally, and then begins displaying data.
[ON]
switch to power up the
Caution!
March 2008
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents