Times Required To Perform Prime, Washes, And Cell Blank - Siemens ADVIA 2400 Operator's Manual

Chemistry system
Hide thumbs Also See for ADVIA 2400:
Table of Contents

Advertisement

WASH 3 or Startup wash, 26 minutes
CTT position 51
RTT1 position 50
RTT2 position 50
WASH 2 or Shutdown wash, 38 minutes
CTT position 15
CTT position 16
CTT position 49
CTT position 50
RTT1 position 49
RTT1 position 50
RTT2 position 49
RTT2 position 50
Weekly wash set up
Same as WASH 2, except replace the 10% cuvette wash with 5%
reagent probe wash in both the CTT and RTT positions.

Times required to perform prime, washes, and cell blank

Typical times
Operation
PRIME1
WASH1
WASH2
WASH3
Cell blank
Times for combined operations during startup and shutdown
Startup
PRIME1 + WASH3 = 28 minutes
PRIME1 + WASH3 + Cell blank = 42 minutes
Operating the System
(1) At the Menu Panel, select
(2) Execute a Barcode Scan at the Reagent Inventory window.
(3) Evaluate calibration status.
4. Perform a start-up wash.
DI water (tube)
DI water (70-mL container)
DI water (70-mL container)
ISE detergent (cup)
DI water (tube)
10% cuvette wash (tube)
DI water (tube)
10% cuvette wash (70-mL
container)
DI water (70-mL container)
10% cuvette wash (70-mL
container)
DI water (70-mL container)
Cycles
Time (minutes)
5
1:40
1
9:10
2
38
1
26
NA
14
, then select
Reagent
Reagent Inventory
.
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents