7.7
Preventive Maintenance Checklist
The following is the check items of each unit at preventive maintenance.
Symbols/Values used in the checklist
Cleaning
A: Clean with alcohol
B: Clean with soft pad,
cloth or vacuum
cleaner
Notes:
•
Perform cleaning and lubricating in the following timing. Lubricate the replacement parts
according to the replacement cycle.
e-STUDIO206L
e-STUDIO256
e-STUDIO306
e-STUDIO356
e-STUDIO456
e-STUDIO506
•
Values under "Replacement" indicate the replacement cycle for the e-STUDIO206L/256/306/
356/456/506 / e-STUDIO207L/257/307/357/457/507.
•
The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
•
Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
e-STUDIO206L/256/306/356/456/506 / 207L/257/307/357/457/507
PREVENTIVE MAINTENANCE (PM)
Lubrication/Coating
L: Launa 40
SI: Silicon oil
W1: White grease (Molykote EM-
30L)
W2: White grease (Molykote HP-
300)
AV: Alvania No.2
FL: Floil (GE-334C)
CG: Conductive grease (KS-660)
C:
Coating material
(SANKOL CFD-409M)
Model
e-STUDIO207L
e-STUDIO257
e-STUDIO307
e-STUDIO357
e-STUDIO457
e-STUDIO507
Replacement
Value: Replacement
cycle
R1: Replacement
R3: Replace if
deformed or damaged.
Replacement cycle
every 80,000 sheets
every 100,000 sheets
every 120,000 sheets
every 125,000 sheets
every 150,000 sheets
every 150,000 sheets
© 2011-2014 TOSHIBA TEC CORPORATION All rights reserved
7 - 16
Operation check
After cleaning or
replacement, confirm
there is no problem.