Preventive Maintenance Checklist; Symbols/Values Used In The Checklist - Toshiba e-STUDIO206L Service Manual

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO206L:
Table of Contents

Advertisement

7.7

Preventive Maintenance Checklist

The following is the check items of each unit at preventive maintenance.

Symbols/Values used in the checklist

Cleaning
A: Clean with alcohol
B: Clean with soft pad,
cloth or vacuum
cleaner
Notes:
Perform cleaning and lubricating in the following timing. Lubricate the replacement parts
according to the replacement cycle.
e-STUDIO206L
e-STUDIO256
e-STUDIO306
e-STUDIO356
e-STUDIO456
e-STUDIO506
Values under "Replacement" indicate the replacement cycle for the e-STUDIO206L/256/306/
356/456/506 / e-STUDIO207L/257/307/357/457/507.
The replacement cycle of the parts in the feeding section equals to the number of sheets fed
from each paper source.
Be careful not to put oil on the rollers, belts and belt pulleys when lubricating.
e-STUDIO206L/256/306/356/456/506 / 207L/257/307/357/457/507
PREVENTIVE MAINTENANCE (PM)
Lubrication/Coating
L: Launa 40
SI: Silicon oil
W1: White grease (Molykote EM-
30L)
W2: White grease (Molykote HP-
300)
AV: Alvania No.2
FL: Floil (GE-334C)
CG: Conductive grease (KS-660)
C:
Coating material
(SANKOL CFD-409M)
Model
e-STUDIO207L
e-STUDIO257
e-STUDIO307
e-STUDIO357
e-STUDIO457
e-STUDIO507
Replacement
Value: Replacement
cycle
R1: Replacement
R3: Replace if
deformed or damaged.
Replacement cycle
every 80,000 sheets
every 100,000 sheets
every 120,000 sheets
every 125,000 sheets
every 150,000 sheets
every 150,000 sheets
© 2011-2014 TOSHIBA TEC CORPORATION All rights reserved
7 - 16
Operation check
 After cleaning or
replacement, confirm
there is no problem.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents