Frame Assembly
55 to 60 ft- -lb
(75 to 81 N- -m)
3
RIGHT
FRONT
1. ROPS assembly
2. Cap screw (4 used)
3. RH side casting
4. Lock nut (4 used)
5. Flange head screw (8 used)
The Greensmaster TriFlex Hybrid frame assembly is il-
lustrated in Figure 24. If the fasteners used to secure the
front castings or ROPS assembly are loosened or re-
moved, refer to Figure 24 for fastener tightening torque
recommendations.
Chassis
100 to 110 ft- -lb
1
(136 to 149 N- -m)
2
5
10
6
6. LH side casting
7. Step
8. Step plate
9. Washer head screw (9 used)
10. Frame assembly
Page 7 - - 28
13
12
11
9
4
7
9
Figure 24
14
55 to 60 ft- -lb
(75 to 81 N- -m)
5
9
8
9
11. R- -clamp (2 used)
12. Manual tube
13. Cap
14. Plug
Greensmaster 3320/3420