GE GL317D Instruction Manual page 76

Sf6 circuit- breaker
Table of Contents

Advertisement

Checking of the insertion resistor
Process
03- 2017
Installation
Chamber - Column Coupling
The table below gives the steps of checking of the insertion resistor :
Step
Action
1
On each resistor, remove
the plug (36) fixed by
screws (37).
2
Measure the ohmic value
using a multimeter.
If the measured value
does not correspond to
the value indicated on the
plug, contact our Cus-
tomer Service.
3
Re- install the plugs (36)
using the screws (37), refer-
ring to "Screw sealing" in
"Erection general proced-
ures".
GE Information
Diagram
x 6
37
36
H M8- 25
Ω
36
x 6
37
H M8- 25
1,6 daN.m
L31- 7142EN/02
4/18