GE GL317D Instruction Manual page 225

Sf6 circuit- breaker
Table of Contents

Advertisement

Grid Solutions
CAUSE OR ORIGIN OF HAZARD.
Our equipment contains moving parts (linkage, levers, etc.), reserve power (springs, accumulators, etc.)
and pressurized sheathing ; the associated hazards are dealt with in safety sheet "Pressurized Equipment"
PS 0003/A.
WORK REQUIREMENTS.
Follow the relevant Grid Solutions operating and maintenance instructions.
Prior to any work on the control equipment and the motion transfer mechanism, disable the springs on
mechanically operated units and bring pressure back to zero for hydraulically operated units.
SAFETY INSTRUCTIONS.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, work on the control equipment and transmissions must be performed by qualified operators
wearing personal protective clothing and using the appropriate tools and equipment.
PS 0007EN
05
Sheet N°
Revision
SAFETY SHEET
M A C H I N E R Y
G. BERNARD
1998-08-12
Written by
Date
J. VIAT
Signature Approved by
2011-03-21
Date
Signature Page
1 / 2

Advertisement

Table of Contents
loading

Table of Contents