GE GL317D Instruction Manual page 254

Sf6 circuit- breaker
Table of Contents

Advertisement

Frame- support assembly, continued
Process, continued
02- 2017
Installation
Supporting frame assembly
The table below gives the steps of installing the supports of the frame:
Step
7
Install the strengthening pieces (21) outside the frame- support with
the use of the screws (20).
21
8
Tighten all the screws to the recommended torques.
18daN.m
GE Information
Action
2 x 2
20
H M16-45
L31- 140EN/03
8/8

Advertisement

Table of Contents
loading

Table of Contents