GE GL317D Instruction Manual page 73

Sf6 circuit- breaker
Table of Contents

Advertisement

Presentation
Markings
Time taken for
coupling operation
Lifting means
Stages of the
coupling operation
03- 2017
Installation
Chamber - Column Coupling
Before coupling the chambers and column, check that the markings on the
breaking chambers correspond with those on the column
The final chamber/column coupling operations should be completed in a
time of  40 min.
NOTE:
The coupling operations must be carried out by a min-
imum of two people.
T(max)  40 min
Provide an adequate means of hoisting:
3,000 daN (minimum)
The chamber- column coupling operation can be broken down into a num-
ber of stages:
Step
A
Positioning the chamber casing
B
Preparing the breaking chambers
C
Checking of the insertion resistor
D
Preparing the column's corona shield
Preparing the elements required for the coupling opera-
E
tion
F
Hoisting and preparing the column
Final coupling
G
GE Information
H
Subject
H + 2 m
H +1 m
Page
2
3
4
5
6
8
9
L31- 7142EN/02
1/18