Preparing the operating device
Unpacking
Optical signalizations Check the position of operating device optical signalization :
Necessary
components
Installing the
necessary
components
11- 2016
Installation
Installation of operating device
Remove packaging protection and check that operating device and pole
reference numbers are the right ones.
Circuit- breaker
Open
List of the Grid Solutions components necessary for the operation :
Mark
Diagram
(11)
(22)
- Install the spacers (22) on the screws (9) outside the operating device.
- Install the seal (11) on the operating shaft (13).
- Check the presence of grease (ASEOL 0- 365.2) on the operating shaft
(13).
GE Information
Closing spring
Released
Designation
Seal
Spacer
11
22
x 4
9
L31- 7902EN/02
Number
1
4
13
2/12