GE GL317D Instruction Manual page 286

Sf6 circuit- breaker
Table of Contents

Advertisement

Preparing the pole operating shaft, continued
"Manual opening"
operation
11- 2016
Installation
Installation of operating device
The table below gives the steps of "manual opening" operation :
Step
Action
1
Remove the securing tool
(4) then screw the operating
lever (6) onto the flange on
the front of the handle
sleeve (12).
2
With the help of the lever (6),
effect a 60 rotation of the
sleeve (12).
GE Information
Diagram
4
12
6
6
12
L31- 7902EN/02
4/12

Advertisement

Table of Contents
loading

Table of Contents