6.7 Installation Checklist

Check the installation items, installation environment, and cable-related items after the cabinets
and devices are all installed.
Cabinet Installation Checklist
Table 6-11
Table 6-11 Cabinet installation checklist
No.
1
2
3
Issue 06 (2011-09-15)
Remove the protecting hood from the electrical pole of the battery.
Install the series connection copper bar on the electrical poles of neighboring battery cells.
Install the cables for the batteries. The red cable is the power cable for the positive pole,
and the black cable is the power cable for the negative pole.
shows the routes of the power cables in the battery cabinet.
describes the cabinet installation checklist.
Item
The installation position of the cabinet strictly complies with the engineering
design.
In the wall-mounted scenario, the holes of the mounting ears are well aligned with
the holes of the expansion bolt assemblies. In addition, the mounting ears are
secured on the wall evenly and steadily.
In the metal-pole-mounted scenario, the supports for the metal pole are secure on
the floor.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
in an APM30H)
136

Advertisement

Table of Contents
loading

Table of Contents