Installation Scenarios - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
A DBS3900 mainly includes a BBU and RRUs. RRUs can be installed remotely so that a
DBS3900 can be deployed indoors or outdoors. When a DBS3900 is deployed outdoors with
AC or DC power supply, the BBU can be installed in an APM30H, TMC11H, or OMB. When
a DBS3900 is deployed indoors with DC power supply, the BBU can be installed in an IMB03,
19-inch rack of customers, or wall.
Table 3-1
Table 3-1 Installation scenarios
Application
Environment
Outdoors
Issue 06 (2011-09-15)
describes the DBS3900 installation scenarios.
NOTE
The APM30H, TMC11H, IBBS200T, and IBBS200D described in the following are the Ver.B series
cabinets.
Power Supply
AC
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3

Installation Scenarios

Installation
Position of Main
Devices
The BBU is installed
in an APM30H, and
the RRUs are
installed remotely.
The APM30H
supplies power to the
BBU and remote
RRUs.
The BBU is installed
in an OMB, and the
RRUs are installed
remotely. The OMB
supplies power to the
BBU and remote
RRUs.
3 Installation Scenarios
Reference
Outdoor Scenario
with AC Power
Supply (BBU
Installed in an
APM30H)
Outdoor Scenario
with AC Power
Supply (BBU
Installed in an
OMB)
8

Advertisement

Table of Contents
loading

Table of Contents