11.4 Installing Cables

This section describes the procedures and precautions to be taken for installing PGND cables,
power cables, transmission cables, monitoring signal cables or alarm cables, and CPRI cables
in an indoor wall-mounted scenario for a DBS3900.

11.4.1 Cabling Requirements

Cables must be routed according to the specified cabling requirements to prevent signal
interference.
General Cabling Requirements
The bending radius of the cables must meet the following specifications:
l
l
l
l
l
l
The cables must be bound as follows:
l
l
l
l
The cables must be routed as follows:
l
l
l
Special Cabling Requirements
Cabling requirements for power cables are as follows:
l
Issue 06 (2011-09-15)
NOTE
If a cable listed below is not required, skip the routing requirements of the cable.
The bending radius of the 7/8'' feeder must be more than 250 mm (9.84 in.), and the bending
radius of the 5/4'' feeder must be more than 380 mm (14.96 in.).
The bending radius of the 1/4'' jumper must be more than 35 mm (1.38 in.). The bending
radius of the super-flexible 1/2'' jumper must be more than 50 mm (1.97 in.), and the bending
radius of the ordinary 1/2'' jumper must be more than 127 mm (5 in.).
The bending radius of the power cable or PGND cable must be at least five times the
diameter of the cable.
The bending radius of an fiber optic cable is at least 20 times the diameter of the fiber optic
cable.
The bending radius of the E1/T1 cable must be at least five times the diameter of the cable.
The bending radius of the signal cable must be at least five times the diameter of the cable.
Different types of cables must be separately routed and cannot be entangled.
The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.
The cable ties must face the same direction, and those at the same horizontal line must be
in a straight line. Extra length of cable ties must be cut.
Labels or nameplates must be attached to the cables after they are installed.
Different types of cables must be separately routed with a minimum space of 30 mm (1.18
in.) between every two cables.
Different types of cables must be installed in an untangled and orderly fashion.
Different types of cables must be routed in parallel or separated by special objects.
-48 V power cables must be bound together.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11 Indoor Scenario with DC Power Supply (BBU Installed
on a Wall)
379

Advertisement

Table of Contents
loading

Table of Contents