Installing Components - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
2.
Figure 6-36 Installing a PGND cable and equi-potential cable
(1) Ground bar on the inner side of the cabinet (2) Equi-potential cable (3) PGND cable (4) Ground busbar
Step 3 Route and bind the cables. For details, see
Step 4 Label the installed cables. For details, see Attaching a Cable-Tying Label.
Step 5 Run each cable that leaves the cabinet in a PVC corrugated pipe, and then tie the pipe to the
cable hole on the cabinet.
----End

6.4 Installing Components

The BBU and SLPU must be installed in the APM30H and TMC11H. The SOU, heater, EMUA
or GPS surge protector optional based on actual requirements.
Issue 06 (2011-09-15)
Figure 6-35 Installing the OT terminal in the correct manner
Install an equi-potential cable in each cabinet, as shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Outdoor Scenario with AC Power Supply (BBU Installed
6.5.1 Cabling
Requirements.
in an APM30H)
Figure
6-36.
51

Advertisement

Table of Contents
loading

Table of Contents