Installing Cables - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Step 2 Slide a BBU along the guide rails into an OMB, and then tighten four M6x16 screws on the
panel until the tightening torque reaches 3 N·m, as shown in
Figure 9-13 Installing a BBU
----End

9.4 Installing Cables

This section describes the procedures and precautions to be taken for installing power cables,
transmission cables, monitoring signal cables, and CPRI cables when a DBS3900 is deployed
outdoors and the BBU is installed in an OMB.
Issue 06 (2011-09-15)
Figure 9-12 Installing the mounting ears reversely
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Outdoor Scenario with DC Power Supply (BBU Installed
Figure
in an OMB)
9-13.
298

Advertisement

Table of Contents
loading

Table of Contents