Indoor Scenario (Bbu Installed In An Imb03) - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
13
About This Chapter
This chapter describes the procedures for installing an IMB03, components in it, and related
cables when a DBS3900 is deployed indoors and the BBU is installed in the IMB03.
13.1 Dimensions and Installation Clearance Requirements
This section describes the dimensions and installation clearance requirements of the IMB03.
13.2 Installation Process
This section describes the process of installing the IMB03.
13.3 Installing the IMB03
This section describes the procedures for installing the IMB03 on the wall and IFS06.
13.4 Installing Devices in the IMB03
This section describes the procedures for installing the BBU and power device in the IMB03.
The power device can be the DCDU or AC/DC power device.
13.5 Installing IMB03 Cables
This section describes cable connections and the process of installing cables.
13.6 IMB03 Hardware Installation Checklist
After the IMB03 is installed, you must check the hardware installation.
13.7 Power-On Check
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
13.8 Installing the Cover Plate for the IMB03
This section describes the procedure for installing the cover plate for the IMB03.
Issue 06 (2011-09-15)
Indoor Scenario (BBU Installed in an
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

13 Indoor Scenario (BBU Installed in an IMB03)

IMB03)
433

Advertisement

Table of Contents
loading

Table of Contents