Huawei DBS3900 Installation Manual page 497

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (Ver.B)
Installation Guide
Figure 13-53 Cable connections in the AC power supply scenario
l You may need to prepare cables according to actual cable routes during the cable installations.
l Attach engineering labels to both ends of the cable after each cable is installed.
l When routing the power cable and PGND cable on the bottom of the IMB03, ensure that the
Table 13-4 Cable list
S
N
a
Issue 06 (2011-09-15)
CAUTION
holes for heat dissipation are not covered.
Cable
PGND cable for the
IMB03
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 Indoor Scenario (BBU Installed in an IMB03)
Connector
2
, M6) Ground terminal in the IMB03
OT terminal (16 mm
Connector added on site
Installation Position
The nearest wiring terminal on
the ground bar
484

Advertisement

Table of Contents
loading

Table of Contents