HP 3457A Service Manual page 87

Hide thumbs Also See for 3457A:
Table of Contents

Advertisement

Operational
Verification
Tests
Rear Input Operational Verification Tests (Standard Instrument)
REAR TERMINALS
450V pk MAX
TO
FRONT
TERMINALS
ORS
CUSENSE (4 wiRE)
'INPUT (2 WIRE)
HI
LO
HI
LO
AX
Figure 4-20. Standard Instrument Rear Input Test Connections
4-90. Preliminary Steps
1. Short
the Rear
Input
HI and
LO
terminals
and
the Q Sense
HI and
LO terminals
as shown
in
Figure 4-9,
2. Select the Rear Terminal
Input. (Press the TERM
configuration
key, enter
the number
2 and press
the ENT key
4-91. DC Voltage Function - Rear Terminal Offset Test
4-92. Equipment Required. A low thermal short (copper wire) is required for this procedure,
lL. Set the HP 3457A to the DC Voltage function (DCV) and the number
of digits displayed (DIGITS
DISP) to six.
2. Test the HP 3457A input offset on the 30 V, 3 V and 300 mV ranges and record the reading of
each range on the Test Record provided at the end of this section.
Begin with the 30 V range to allow
any thermal voltages which might affect the readings on the lower ranges to dissipate.
3. If any of the offset readings are beyond the limits specified in Table 4-29 and on the Test Record,
the instrument should be calibrated. Refer to Section V of this manual for calibration procedures.
3457A
3457A
134570 | 34570
90 day limits
1 year Limits
Input
|Range | Set Up
High
Low
High
Low
Short
| 30 v | pcv
+ 00.00020 v
- 00.00020 v
+ 00.00020 v
- 00.00020 v
Short
3v | pev
+
0.000007 v
0.000007 v
+
0.000007 v
0.000007 v
Short
|300 mv|
pcv
+000.0040 mv
-000.0040 mv
+000.0040 mv
=000.0040 mv
4-32
Table 4-29. DC Voltage Offset Test Limits (Rear Terminals)

Advertisement

Table of Contents
loading

Table of Contents