Hauling The Machine; Locating The Tie-Down Points - Toro 30608 30644 Operator's Manual

Table of Contents

Advertisement

There are jacking points located at the front and rear
of the machine.
On the frame at the inside of each front drive tire
At the center of the rear axle

Hauling the Machine

Remove the key and shut off the fuel (if equipped)
before storing or hauling the machine.
Use care when loading or unloading the machine
into a trailer or a truck.
Use full-width ramps for loading the machine into
a trailer or a truck.
Tie the machine down securely.
Locating the Tie-Down
Points
There are tie downs located at the front and rear sides
of the machine
(Figure
Note:
Use properly-rated DOT-approved straps in 4
corners to tie down the machine.
2 on the front of the operator's platform
Rear bumper
1. Rear tie-down point
73).
Figure 73
2. Front tie-down points
g203193
56

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 4110Groundsmaster 4100

Table of Contents