5 5 . . 6 6 H H a a z z a a r r d d s s
5 5 . . 6 6 . . 1 1 H H e e a a v v y y L L i i f f t t i i n n g g
C C a a u u t t i i o o n n
Heavy machine parts are handled regularly when operating the Arcam EBM System. Use the
provided loading trolley at all times and whenever needed call for lifting assistance. There is a
serious risk of injury if these items are handled incorrectly!
C C a a u u t t i i o o n n
To avoid trip hazard, make sure to park the trolley in its allocated space, see Pre-Installation
Guide.
C C a a u u t t i i o o n n
To eliminate the risk of dropping the build tank or hoppers when using the trolley, make sure that:
the trolley forks are fully inserted in the fork channels before lifting.
• the build tank or hoppers are fully inserted into the chamber before the trolley is released.
Arcam EBM provides a trolley to be used when moving heavy machine parts. The
trolley lift bracket is specially designed (differs between the EBM Machines) to han-
dle the build tank and the hoppers. A reload tray can be used to assist the removal
of small builds from the EBM Machine.
Procedures for proper use are found in the separate Trolley Manual supplied by
Svenema.