Device Maintenance; Routine Maintenance - Huawei LUNA2000-100KTL-M1 User Manual

Smart power control system
Hide thumbs Also See for LUNA2000-100KTL-M1:
Table of Contents

Advertisement

LUNA2000-100KTL-M1 Smart Power Control System
User Manual
● Wear insulated gloves and use insulated tools to prevent electric shocks or
● Before performing maintenance, power off the equipment, follow the

7.1 Routine Maintenance

Maintenance Items
To ensure long-term operation of Smart PCS, you are advised to perform routine
maintenance as described in this chapter.
When cleaning the system, connecting cables, and checking grounding reliability,
power off the system and ensure that the external switches on the DC and AC
sides are turned off.
Issue 02 (2023-01-10)
D ANGER
short circuits.
WARNING
instructions on the delayed discharge label, and wait for a period of time as
specified to ensure that the equipment is not energized.
CA UTION
Copyright © Huawei Technologies Co., Ltd.
7

Device Maintenance

7 Device Maintenance
72

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents