Item
Method
Pre-fab.
Check the pre-fab.
module
module exterior for
repainting
damage or corrosion.

4.5 Semi-annual Maintenance

4.5.1 Power Supply and Distribution System

Table 4-11 Semi-annual maintenance checklist for the power supply and
distribution system
Maintena
nce Item
PDF

4.5.2 Cooling System

Table 4-12 Semi-annual maintenance checklist for the cooling system
Ite
m
Inte
llig
ent
He
at
Issue 03 (2022-12-15)
Check Standard
The pre-fab.
module and
bases are free
from paint
flake-off, rust, or
corrosion.
Instructions
Check the
luminance of the
indicators.
Check the SPD
indicator and
SPD circuit
breaker status.
Mainten
Description
ance
Item
Appearan
Check whether the
ce
air conditioner is
clean and free
from dust and dirt.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Troubleshooting
Maintain or replace the rusty or
damaged part of the pre-fab. modules.
Repaint areas with paint flake-off or
rust.
Criteria
Troubleshooting
The three-
Replace the indicator that
phase power
generates no or dim light.
indicators are
bright.
The SPD
If the SPD indicator is red,
indicator is
replace the SPD.
green.
The SPD
Switch on the circuit breaker.
circuit
breaker is
switched to
ON.
Troubleshooting
Use a brush or cotton cloth to clean up
dust and dirt on the air conditioner.