General; Recommended Tools; Manufacturer Recommendations; Pm Form - GE ApexPro Service Manual

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

General

Recommended Tools

Manufacturer Recommendations

PM Form

Revision C
Maintenance: General
Leakage Tester
Digital Multimeter
ESD Mat and Wrist Strap
Standard Hand Tools
:$51,1*
EQUIPMENT FAILURE/HEALTH HAZARD — The
manufacturer does not in any manner, assume the responsibility
for performing the recommended maintenance schedule, unless an
Equipment Maintenance Agreement exists. The sole
responsibility rests with the individuals, hospitals, or institutions
utilizing the device. Failure on the part of all responsible
individuals, hospitals or institutions, employing the use of this
device, to implement the recommended maintenance schedule
may cause equipment failure and possible health hazards.
To make sure the ApexPro Telemetry Server hardware remains in proper
operational and functional order, a good maintenance schedule must be adhered to.
The manufacturer recommends the following:
Visual Inspection: Should be performed by service personnel upon receipt of
the equipment, one time per year thereafter, and prior to servicing the unit.
Cleaning: Should be performed by service personnel upon receipt of the
equipment, one time per year thereafter, and each time the unit is serviced.
Calibration: No calibration is required.
Electrical Safety Checks: Should be performed by service personnel upon
receipt of the equipment, one time per year thereafter, and every time the unit is
serviced.
Checkout Procedure: Should be performed by qualified service personnel
upon receipt of the equipment, one time per year thereafter, and each time the
unit is serviced.
Replacing the Hard Drive: You should replace the hard drive every three
years. Refer to
"Hard Drive"
information.
For the latest PM form regarding this product, contact GE Medical Systems
Information Technologies Service. Make a copy of the GE Unity Network
Information Suite Server PM form and use the copy to help guide you as you go
through this section of the manual. The PM form can then be archived for reference
after completion of all the steps required to completely test the equipment.
ApexPro Telemetry Server
2001989-178
on page 6-30 for hard drive replacement
4-3

Advertisement

Table of Contents
loading

Table of Contents