Installation Manual
Airbridge cBTS3612 CDMA Base Station
The path with the width no less than 0.8m should be left in front of the cabinet.
l
The cabinet should be positioned as close as possible to the feeder window to
l
reduce the length of the feeder cable.
Figure 3-4 The layout ichnography of the equipment room
3.2 Installation on Cement Floor
3.2.1 Cabinet Installa tion
Figure 3-5 shows the installation of cBTS3612 cabinets on cement floor.
Power
distribution room
BTS
BTS
BTS
Auxiliary
Main
Auxiliary
Environment
alarm collecting box
3-4
Hardware Installation
3 Cabinet Installation
Transmission
equipment