Commissioning Devices - Huawei ECC500 User Manual

Hide thumbs Also See for ECC500:
Table of Contents

Advertisement

ECC500
User Manual

4.4 Commissioning Devices

Checking Cable Connections and Powering On the ECC500
Check that power cables, ground cables, RS485 communications cables, and AI/DI signal
cables are connected to the main control module, RS485 expansion card, AI/DI expansion
card, and AI/DI module in the manner specified in
external power supply to the power module to power on the ECC500.
Checking Indicator Status
Check the indicators on the main control module, RS485 expansion card, AI/DI expansion
card, and AI/DI module.
Table 4-1 Indicator description
Module
Main control module
RS485 expansion card,
AI/DI expansion card,
and AI/DI module
Setting ECC500 Communications Parameters (LCD)
Table 4-2
Table 4-2 Communications parameters
Parameter
IP address
Subnet mask
Gateway
Figure 4-18
Issue 03 (2020-01-06)
Table 4-1
lists the communications parameters that can be set over the LCD.
Description
Set to 192.168.1.168 by default but can be adjusted according to the
network plan.
Set to 255.255.255.0 by default but can be adjusted according to the
network plan.
Set to 192.168.1.1 by default but can be adjusted according to the
network plan.
shows the procedure for setting these communications parameters.
Change the password after your first login.
Copyright © Huawei Technologies Co., Ltd.
4.3 Connecting
describes their normal status.
Normal Indicator Status
The run indicator blinks (on for 1s and then off for 1s).
The alarm indicator is off.
The PWR indicator is steady on.
The RUN indicator blinks (on for 1s and then off for 1s).
The ALM indicator is off.
4 Installation and Commissioning
Cables. Connect the
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

V600r001c01

Table of Contents