3.2
Electrical connection checklist
No.
Check Item
1
All cables are connected properly.
2
The ground cable is connected properly.
3
The excess section of ground cables and power cables is cut off.
4
Phase cables are connected properly.
Power cables and ground cables are routed and bundled separately from
5
other types of cables.
6
All circuit breakers are OFF.
3.3
Cable installation checklist
No.
Check Item
All bolts are tightened, especially the bolts used for electrical connection. Flat
1
washers and spring washers are installed properly.
2
Cables are bundled neatly, and cable ties are secured evenly and properly.
3
Cables are routed for ease of future maintenance and expansion.
4
There are no unnecessary adhesive tape or cable ties on the cables.
Exposed parts near the wiring terminals and lugs are wrapped in PVC
5
insulation tape or heat shrinking tubing.
The cable routing for power cables and monitoring cables meets the
6
requirements for routing power cables and signal cables and complies with the
cable routing plan.
4

Power-On Commissioning

1. Switch on the SPD circuit breaker. If the SPD indicator is green, the SPD is running properly. If
the SPD indicator is red, the SPD is faulty and must be replaced immediately.
2. Switch on the upstream output circuit breakers to power on the PDC. If the power indicator on the
front panel of the PDC lights up, the PDC is powered on properly.
Click the textbox after the IP address assign, and choose Automatic (DHCP).
Set Rated frequency and Rated line voltage on the System Param. screen based on the
actual situation and retain default values for other system parameters.
The user name is admin (preset password: 000001).
8
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
Result
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No
□Yes □No

Advertisement

Table of Contents
loading

Table of Contents