Table 2-1 Tools required for the commissioning of the BTS3900/BTS3900A...................................................2-2
Table 3-1 Commissioning procedure (transmission available)............................................................................3-2
Table 3-2 Commissioning procedure (transmission unavailable)........................................................................3-5
Table 4-1 Monitoring boards of the BTS3900 and the BTS3900A...................................................................4-28
Table 5-1 TRX types configured on the BTS3900 GSM or the BTS3900A GSM..............................................5-7
Table 5-2 Normal states of the LEDs on the board and modules in the BBU....................................................5-27
Table 5-3 Normal states of the LEDs on the DRFU...........................................................................................5-27
Table 5-4 Normal states of the LEDs on the GATM.........................................................................................5-28
Table 5-5 Normal states of the LEDs on the FAN unit......................................................................................5-28
Table 5-6 Normal states of the LEDs on the PMU.............................................................................................5-28
Table 5-7 Normal states of the LEDs on the PSU..............................................................................................5-29
Table 5-9 Checklist for the connection of the signal cables...............................................................................5-33
Table 6-1 Parameter required in RF performance test..........................................................................................6-4
Table 7-1 Possible causes and handling suggestions for failed communication between the SMT and the BTS
...............................................................................................................................................................................7-2
Table 7-2 Meaning of the state of the LIU LEDs (UELP used)..........................................................................7-5
Table 7-3 Meaning of the state of the LIU LEDs (UELP not used)....................................................................7-6
Table 7-4 Possible causes and handling suggestions for service dialing failure..................................................7-7
Table 7-5 Description of the DIP switch SW2 on the GTMU.............................................................................7-7
Table 8-1 Data sheet for BTS commissioning......................................................................................................8-1
Table 9-1 The Communication Port Used by GBTS............................................................................................9-1
Issue 02 (2009-04-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Tables
Tables
vii

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a gsmV300r008

Table of Contents