Huawei BTS3900 GSM Commissioning Manual page 94

Hide thumbs Also See for BTS3900 GSM:
Table of Contents

Advertisement

5 Commissioning the BTS (Transmission Unavailable)
SN
9
10
11
12
13
----End
5-34
Check Item
The cable layout facilitates maintenance and future capacity expansion.
All the labels and tags at both ends of the cables are legible.
The unused ports are covered with dust-proof covers and matching plugs.
The indoor 1/2-inch jumpers are distributed according to the layer and
sector.
The indoor 1/2-inch jumpers are kept straight for 300 mm at their joints
with the cabinet.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
BTS3900(A) GSM
Commissioning Guide
Issue 02 (2009-04-20)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a gsmV300r008

Table of Contents