PDU8000 Modular Precision Power Distribution Cabinet
User Manual
9.1 O&M Precautions
O&M Personnel Skill Requirements
O&M personnel must be qualified power distribution system engineers who are familiar with
the data center power supply and distribution system configurations and the operations for
each core component.
Technical Documents
Table 9-1
Table 9-1 Technical document
Technical Document
Schematic diagram
9.2 Routine Maintenance
Routine maintenance is performed on a regular basis when the equipment is running properly
to find out and eliminate defects or potential risks in a timely manner.
The routine maintenance interval defines the frequency of performing maintenance tasks.
Perform regular maintenance according to maintenance items listed in
Issue 01 (2016-02-27)
9
Operation and Maintenance
lists the technical document required for PDC installation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Function
Describes the control
relationship of the power
distribution system.
9 Operation and Maintenance
Obtaining Method
(Remarks)
See
G Electrical
Conceptual
Diagram.
Table
9-2.
71