Preparing Consumables; Checking Personnel Requirements; Checking The Installation Environment; Packing, Transportation, And Unpacking - Huawei PDU8000 User Manual

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual

4.2.3 Preparing Consumables

(Optional) Prepare firestop putty for sealing cable holes after cable connection. The firestop
putty is to be prepared by the customer.

4.2.4 Checking Personnel Requirements

Construction personnel must have basic knowledge of safe operation, be trained to master
correct operation methods, and have the appropriate job qualifications.
When the customer organizes construction personnel, ensure that:

4.2.5 Checking the Installation Environment

Check that the installation environment meets the requirements before installation. For details
about the check items, see the site requirements.

4.3 Packing, Transportation, and Unpacking

Packing
Unless otherwise stipulated, select appropriate packing and transportation units according to
Huawei transportation specifications.
Use appropriate packing materials to protect cabinets during transportation and storage. The
standard packing materials include:
To prevent moisture, pack cabinets with film, and fill desiccants between the film and
cabinets.
Transportation and Unpacking
Issue 01 (2016-02-27)
Construction personnel have been trained and qualified by Huawei to master methods for
system installation and commissioning, and have obtained work permits before they
begin to install and commission equipment.
Technical personnel from the customer have been trained by Huawei and have mastered
the methods for installation and construction.
The number of construction personnel depends on the project progress and the
installation environment.
Construction personnel have read through the safety precautions and related product
documents before they begin work.
Huawei will not be liable for any consequences caused if the installation environment does not meet the
requirements.
Wooden pallet
Moisture-proof plastic bag
Corner protector
Carton
After the equipment is delivered to the installation site, representatives from the
customer and Huawei unpack and inspect the equipment together.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
21