Huawei RP100 Commissioning Manual page 25

Room presence
Hide thumbs Also See for RP100:
Table of Contents

Advertisement

HUAWEI RP100&RP200 Room Presence
Commissioning Guide
Figure 3-5 Removing fasteners from the packing case
Step 5 Take out the rack and place it in an appropriate position in the conference room.
For details about where you can place the rack, see the Standard Document to the Decoration
of Huawei RP Series Telepresence Conference Room.
The rack is heavy. At least two persons are required to hold and move it. When lifting or moving
the rack, pay special attention to your safety. Use one hand to hold the rack base and the other
hand to hold one side of the rack, as shown in Figure 3-7. Ask your partner to hold the rack in
the same way on the other side. Lift the rack and move it to the left or right to prevent it from
being blocked by the fasteners.
Issue 01 (2015-02-12)
DANGER
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp200Rp100-46sRp100-55sRp200-46sRp200-55s

Table of Contents