Installing A Dry Contact Signal Cable - Huawei PowerCube 5000 User Manual

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000
User Manual (SmartLi 100Ah)
Figure 10-3 Preparing an OT terminal
(1) Cable
(4) Hydraulic pliers
Step 3 The following figure shows how to prepare a cord end terminal.
Figure 10-4 Preparing a cord end terminal
(1) Cable
----End

10.3 Installing a Dry Contact Signal Cable

Procedure
Step 1 Press the contact plate using a flat-head screwdriver to flip the metal spring inside a dry
contact.
Step 2 Connect a signal cable to the dry contact.
Issue 02 (2020-03-17)
(2) Heat shrink tubing
(5) Heat gun
(2) Cord end terminal
Copyright © Huawei Technologies Co., Ltd.
(3) OT terminal
(3) Crimping tool
10 FAQ