Huawei PowerCube 5000 User Manual page 146

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000
User Manual (SmartLi 100Ah)
Procedure
Step 1 Shut down the power system on the SMU.
The SMU generates an "EPO Shutdown" alarm.
Step 2 Connect the ground cable of the ESD wrist strap, and wear the ESD wrist strap and ESD
gloves.
Step 3 Record the connection positions of cables on the MUS01C panel and disconnect the cables.
Step 4 Loosen the screws on both sides of the MUS01C panel.
Step 5 Pull the handle rightwards to remove the MUS01C.
Figure 9-17 Removing an MUS01C
Step 6 Place the new MUS01C into the correct slot in the subrack, and push the MUS01C until its
front panel is flush with the front panel of the subrack.
Step 7 Push the handle inwards until it is engaged, and then tighten the screws.
Issue 02 (2020-03-17)
The new MUS01C board is intact.
Copyright © Huawei Technologies Co., Ltd.
9 Parts Replacement
138

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartli 100ah

Table of Contents