5.2.1 Commissioning Preparations

Table 5-1
Table 5-1 Data preparation
Device
ECC500
Issue 04 (2019-12-20)
Monitor networked devices.
Control the system. For example, reset the monitoring module, enable the DO, and delete
devices that have failed in communication.
Set a mobile phone number for the GPRS board.
Manage user information, including adding, deleting, and modifying user information.
Upgrade software online.
Query and export historical logs and alarms.
View operation logs and export data.
Collect the performance statistics of the main control module and connected subordinate
southbound equipment.
Set the system date and time as well as the site name; save, download, and upload
configuration files.
Set alarm parameters, such as time, monitoring module IP address, SNMP, and site
parameters.
Query e-label, version, and fault information.
Add and view video links.
lists the data required for commissioning.
Parameter
IP address
User name
WebUI password
Copyright © Huawei Technologies Co., Ltd.
Value
Preset value:
192.168.1.168
Preset values:
admin, operator, and
engineer
Preset value:
Changeme
5 UI Description
Remarks
To ensure access
security, change the
IP address upon first
login. For details,
see
7.4 How Can I
Change the ECC500
IP Address on the
LUI?
or
7.5 How
Can I Change the
ECC500 IP Address
on the
WebUI?.
-
To ensure access
security, change the
password upon first
login. For details,
see
7.7 How Can I
Change the ECC500
WebUI
Password?.
Remember the new
password because it
is necessary for
ECC500
39