1
Setting Up the Machine
Base Model
Parts needed for this procedure:
1
Hopper guard
3
Button head bolt (1/4 x 5/8 inch)
3
Locknut
Procedure
1.
Remove the base model machine from the
shipping crate.
2.
At the rear of the twin spinner, remove the bolt
and nut attaching the machine lifting device
shipping bracket to the twin spinner
1. Shipping bracket
3.
At the front of the twin spinner, remove the 2
bolts and nuts attaching the machine lifting
device shipping bracket to the Twin Spinner
(Figure
4).
(Figure
Figure 3
1. Shipping bracket
4.
Lift the twin spinner out of the hopper using the
twin spinner outer grab handles and place the
twin spinner unit on the ground
3).
Note:
This step requires 2 people.
g013203
1. Twin spinner
5.
Remove the 4 screws from the legs of the twin
spinner. With the help of a partner, lift the twin
spinner and remove the packing studs and
packing foam
9
Figure 4
(Figure
Figure 5
(Figure
6).
g013204
5).
g013205