Installing The Carrier Frames To The Cutting Units - Toro Reelmaster 3100-D Operator's Manual

Hide thumbs Also See for Reelmaster 3100-D:
Table of Contents

Advertisement

Figure 14
1. Straight swivel fitting
(return hose)
3.
Wrap a rag around the hose fittings.
4.
Slowly move the lift-cylinder rod until it aligns
with the holes in the right lift-arm flanges
15).
Important:
Some hydraulic fluid is forced
out at the hose fittings when you move the
lift-cylinder rod.
Figure 15
1. Grease fitting
2. Lift arm flange (right)
3. Mounting pin
5.
Assemble the rod to the flanges with the
mounting pin, 2 spacers, and 2 snap rings
(Figure
15).
6.
Apply No. 2 lithium grease to the grease fittings
of the lift arm and the hydraulic cylinder
15).
g346440
2. 90° swivel fitting (lift hose)
(Figure
g346439
4. Snap ring
5. Lift-cylinder rod
6. Spacer
(Figure
7.
Torque the swivel fittings of the return and lift
hoses to 37 to 45 N∙m (27 to 33 ft-lb).
1. Straight swivel fitting
(return hose)
8.
Clean hydraulic fluid from the machine.
7
Installing the Carrier
Frames to the Cutting Units
Parts needed for this procedure:
3
Cutting Unit (optional part—order separately)
Preparing the Cutting Units
1.
Remove the cutting units from the cartons.
2.
Adjust the cutting units as instructed in the
Operator's Manual for the cutting units.
Assembling the Carrier Frames for
the Front Cutting Units
Cutting Unit with Links
Note:
The front carrier frames are part of the optional
lift arm kit.
1.
Align the holes in the plates of the front-carrier
frame with the holes in the cutting unit mounting
plates
(Figure
18
Figure 16
2. 90° swivel fitting (lift hose)
17).
g346476

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 031704092100000317003171

Table of Contents