Installing The Oil Cooler; Installing The Cutting Units - Toro Greensmaster 3250-D Operator's Manual

2-wheel drive traction unit
Hide thumbs Also See for Greensmaster 3250-D:
Table of Contents

Advertisement

7

Installing the Oil Cooler

Optional
No Parts Required
Procedure
If you are operating the machine in an area where
ambient temperatures range from 20 to 49°C (70 to
120°F), or if you use the machine for heavy-duty use
(mowing other areas than greens, such as fairways or
verticutting), install the Hydraulic Oil Cooler Kit (Part
No. 104-7701) to the machine.
8

Installing the Cutting Units

Parts needed for this procedure:
Offset lift hook (Refer to the Cutting Unit Operator's
3
Manual for the installation instructions)
6
Screw (supplied with the cutting unit)
1
Bolt (#10 x 5/8 inch)
1
Jam nut (#10)
3
Cutting unit (sold separately)
6
Ball stud (supplied with the cutting unit)
3
Grass basket
Procedure
Note:
When sharpening, setting the height of cut,
or performing other maintenance procedures on the
cutting units, store the cutting-unit reel motors in the
support tubes to prevent damage to the hoses.
Important:
Do not raise the suspension to the
transport position when the reel motors are in
the holders in the machine frame. Damage to the
motors or hoses could result.
1.
Remove the cutting units from the cartons.
Assemble and adjust them as instructed in the
cutting unit Operator's Manual.
2.
Slide the cutting unit under the pull frame while
hooking the lift hoop onto the lift arm.
3.
Slide the sleeve back on each ball joint receiver
and hook the receiver onto the cutting unit ball
stud
(Figure
10).
1. Pull link extension
2. Pull arm
4.
Mount the basket onto the carrier frame.
5.
Adjust the pull links until there is 2 to 3 mm
(1/16 to 1/8 inch) clearance between the lip of
the basket and the reel blades. Ensure that the
basket lips are equidistant from the reel blades
all the way across the reel blades.
6.
Align the sockets in the ball joints so the open
side of the socket is centered toward the ball
stud. Tighten the jam nuts to secure the sockets
in position.
7.
Ensure that there is approximately 13 mm
(1/2 inch) of the threads exposed on each
reel-drive-motor mounting bolt
14
Figure 10
3. Ball joint receiver
(Figure
11).
g021274

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

04384

Table of Contents