ABB i-bus EIB Product Manual page 51

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
Fig. 54:
Parameter window: "Day routine, Group address inserted"
The new group address is always of type 1 bit.
Fig. 55:
Dialog window: "Day routine, Group address displayed"
The newly inserted group address is then displayed in the right-hand window
under GA No. and GA Name.
Note:
The transfer of the newly created group address to ETS3 is only
carried out after exiting the ABZ/S parameterisation and after
confirming the prompt that the modified data should be saved.
The editing of the group addresses such as modification of the
description or deletion can only be carried out in ETS3.
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents